1 | Ahmedabad – Rajkot Semi High Speed | 1) Pre-Feasibility-Report-of-SHSR.pdf |
2 | Gauge Conversion Of Katosan Road – Becharaji – Ranuj (65 KM) | 1) DPR_Volume_1-1.pdf 2) DPR_Volume_2-1.pdf 3) DPR_Volume_Soil-Investigation Report.pdf 4) Inventory-Report-1.pdf |
3 | Conversion to MSIL from Becharaji (2.5 KM) | 1) DPR_MSIL-Siding-1.pdf |
4 | Rail Connectivity from New Gothangam (DFC Station) to Hazira Port | 1) DPR Volume-1.pdf 2) Geotechnical Investigation Report of All Major Bridge 0 to 8KM 3) Geotechnical Investigation Report of All Minor Bridge 0 to 8KM |
5 | New Rail Line Between Bhimnath to Dholera | 1) DPR Volume-1.pdf 2) Geotechnical Investigation Report 3) Download KMZ 4) Tentative Hydraulic Calculation |
6 | Gati Shakti Multi Model Cargo Terminal (GCT) at Rafleshwar with Rail Connectivity from Makansar Station near Morbi | 1) Detailed Project Report By Railway 2) Detailed Project Report By GCT Siding 3) Geotechnical Investigation Report |
7 | Old Bedi Port Terminal Near Windmill Station of Rajkot Division of Western Railway | 1) Detailed Project Report 2) Geotechnical Investigation Report |