Sr. | Project Details | Contract Value (Cr.) | Period | Name of the Agency | Status |
---|---|---|---|---|---|
1 | Rail Connectivity to Old Bedi Port from Windmill Station in Jamnagar District, Total length of 2.33 KM with 25 KV AC Electrification in Rajkot Division of Western Railway | 42.21 | 12 Months | Ajay Protech Pvt Ltd – S.P. Infracon (JV) | Commissioned on July 2022 |
2 | Gauge Conversion Of Katosan Road – Becharaji (26.6 KM) Metre Gauge to Broad Gauge along with New MSIL BG Siding (Approx 3 KM) at Becharaji with 25 KV AC Electrification in Ahmedabad Division of Western Railway | 263.52 | 24 Months | M/s. Kalpataru Power Transmission Ltd. | Commissioned on March 2023 |
3 | Gauge Conversion of Bechraji (63.83 KM) – Ranuj (101.983 KM) Section, Total Length of 38.153 KM Metre Gauge to Broad Gauge with 25 KV AC Electrification in Ahmedabad Division of Western Railway | 333.62 | 24 Months | M/s. Ashoka Buildcon Ltd. | Commissioned on July 2024 |
4 | Construction of Gati Shakti Multi Model Cargo Terminal (GCT) at Rafleshwar with Rail Connectivity from Makansar Station near Morbi, (approx. length – 4.574 Km) in Rajkot Division of Western Railway | 139.00 | 18 Months | M/s. SP Infracon-P R Patel & Co. (JV) | Commissioned on March 2025 |
5 | Extension of G-BPRL Rail connectivity to Bedi Port terminal near windmill Station of Rajkot Division of Western Railway | 89.6028 | 18 Months | M/s. L.R.Patel & Co. – NCC (JV) | Commissioned on March 2025 |