“Rail Connectivity Boost: Engine Rolls from Makansar to Gati Shakti Multi-Modal Cargo Terminal (GCT) at Rafaleshwar – 18th March 2025”
    - “Rail Connectivity Boost: Engine Rolls from Makansar to Gati Shakti Multi-Modal Cargo Terminal (GCT) at Rafaleshwar – 18th March 2025”
 - More than 4 Lakh car has been dispatched till Jan-2025 at Katosan Road – Becharaji – MSIL Connecting across PAN India
 - Approx 250 Coal Rake has been successfully loaded through Newly Developed Railway Line at Bedi Port, Jamnagar
 - Gauge Conversion of Katosan Road – Becharaji (29.65 KM) Section From Metre Gauge to Broad Gauge along with New MSIL Siding Has been Commissioned Successfully
 - (1) KATOSAN –CHANASMA-RANUJ GAUGE CONVERSION FROM METRE GAUGE TO BROAD GAUGE
 

